Login Register
 
Projects
 
Main » Terminals / Storage / Dock » Project Details
  
Vopak Terminals

Deer Park, TX 

Ongoing Ship Dock 3 Expansion Project is designed to increase loading capacity from 3 ships and 7 barges to 4 ships and 8 barges. This project consists of 350 Tons of structural steel. Pipe installation consists of 30,500 feet of Carbon Steel and 5,550 feet of Stainless Steel. In order to minimize dock downtime the project was built mostly off-site and barged to the site. The project currently has over 150,000 Safe Work Hours.


 

 
 
  Home | Careers | Engineering Services | News | Projects | Contact Us | Intranet | Asset Solutions  
Privacy Statement | Terms Of Use